Skip to main contentSkip to footer
    Facility Type

    High School Roofing in Texas and Oklahoma

    PVC, TPO, and standing seam roofing for high schools across TX and OK. Chemistry lab and kitchen aware, stadium and fieldhouse experience, Class 4 hail systems.

    Call (877) 487-4826

    High schools are the largest, most complex campuses in most districts. Classroom wings, chemistry and biology labs, culinary kitchens, natatoriums, fieldhouses, and stadium press boxes each present distinct roofing conditions.

    TriVAN Roofing reroofs high school campuses across Texas and Oklahoma, from 150,000 sq ft comprehensive high schools to multi-building career campuses in excess of 400,000 sq ft.

    Specs default to 80 mil PVC over chemistry, culinary, and kitchen areas, 80 mil TPO over classroom wings, and standing seam metal over flagship entries, fieldhouses, and press boxes.

    What Makes This Different

    The specific constraints, tradeoffs, and pitfalls we plan around for every project.

    Chemistry and lab aware

    PVC over labs where fume hood exhaust and chemical exposure accelerate TPO and EPDM degradation.

    Culinary and kitchen coverage

    Grease and detergent resistant PVC over culinary programs and full-service kitchens.

    Athletics facility experience

    Standing seam metal and single-ply over natatoriums, fieldhouses, stadium press boxes, and indoor practice facilities.

    Multi-summer capital planning

    Rolling programs that reroof a large campus across two or three consecutive summers with documented watertight phasing.

    TIPS and bond procurement

    Comfortable with competitive bid, TIPS cooperative purchasing, and job order contracts.

    Class 4 hail-rated assemblies

    Standard across the campus in Texas and Oklahoma for insurance and bond-funding requirements.

    Recommended Systems and Approach

    Material and design recommendations tuned to this facility type.

    80 mil PVC

    Standard over chemistry, culinary, and kitchen areas. Also a strong option over locker and shower areas.

    80 mil TPO

    Classroom wings and administrative areas with reflective white surface for cooling load reduction.

    Standing seam metal

    Fieldhouses, natatoriums, press boxes, and flagship entries with 40 to 50 year service life.

    Class 4 hail-rated assemblies

    Standard across the campus in TX and OK.

    Our Process and Scheduling

    High school projects begin with a comprehensive assessment 12 to 18 months before mobilization, infrared moisture survey, and lifecycle cost analysis for the district's bond planning cycle.

    Field work is sequenced by wing or building with daily watertight closeout. Athletics facilities are typically completed first so summer camps and preseason practices can proceed.

    Closeout includes manufacturer NDL warranties, infrared verification, board-ready documentation, and a district maintenance plan aligned to the academic calendar.

    Specifications and Materials We Use

    Manufacturer-certified systems backed by long-form warranties.

    • GAF, Carlisle, Firestone, Johns Manville, Sika, Duro-Last, and MBCI systems
    • 80 mil PVC over chemistry, culinary, and kitchens
    • Standing seam metal over fieldhouses and natatoriums
    • Class 4 impact-rated assemblies
    • 20 to 30 year manufacturer NDL warranties
    • Background-checked, badged crews per district policy

    Frequently Asked Questions

    Ready to Plan Your Campus Roofing Project?

    Get a no-pressure assessment from one of Texas and Oklahoma's most experienced educational roofing teams.

    Call (877) 487-4826