Skip to main contentSkip to footer
    Facility Type

    Community College Roofing in Texas and Oklahoma

    TPO, PVC, and metal roofing for community colleges across TX and OK. Year-round campus phasing, break-week scheduling, and bond-friendly specs.

    Call (877) 487-4826

    Community colleges operate year-round with fall, spring, summer, and mini-mester terms. Unlike K-12 campuses, there is no long summer break where the campus goes quiet, which changes how large reroofs must be scheduled and phased.

    TriVAN Roofing reroofs community college campuses across Texas and Oklahoma including workforce, career and technical, and academic buildings.

    Specs default to 80 mil TPO and PVC with Class 4 hail-rated assemblies, standing seam metal over flagship and workforce buildings, and multi-year rolling programs for large multi-building campuses.

    What Makes This Different

    The specific constraints, tradeoffs, and pitfalls we plan around for every project.

    Year-round campus phasing

    Building-by-building sequencing around continuous course schedules, evening classes, and workforce programs.

    Break-week scheduling

    Loud tear-off and fastening scheduled around finals, break weeks, and inter-term transitions.

    Workforce and CTE lab coverage

    PVC over welding, HVAC, culinary, and diesel labs where exhaust and chemical exposure are heavy.

    Multi-building rolling programs

    5 to 10 year rolling capital programs for large multi-campus districts.

    Bond and TIPS procurement

    Comfortable navigating community college bond procurement and TIPS cooperative purchasing.

    Evening class awareness

    Sequencing that respects evening course meeting times and student parking access.

    Recommended Systems and Approach

    Material and design recommendations tuned to this facility type.

    80 mil TPO or PVC

    Standard for community college academic and administrative buildings.

    PVC over CTE labs and kitchens

    Welding, HVAC, culinary, and diesel programs with grease and chemical exposure.

    Standing seam metal

    Workforce halls, flagship entries, and long-span spaces.

    Class 4 hail-rated assemblies

    Standard across the campus in TX and OK.

    Our Process and Scheduling

    Community college projects begin with a comprehensive assessment and infrared moisture survey. Budget options and lifecycle cost analysis are delivered ahead of the college's bond or capital planning cycle.

    Field work is phased building by building with daily watertight closeout. Loud tear-off and fastening are scheduled around finals, break weeks, and evening class times.

    Closeout includes manufacturer NDL warranties, infrared verification, and a maintenance plan aligned to the college's fiscal year.

    Specifications and Materials We Use

    Manufacturer-certified systems backed by long-form warranties.

    • GAF, Carlisle, Firestone, Johns Manville, Sika, Duro-Last, and MBCI systems
    • 80 mil TPO and PVC standard
    • Class 4 impact-rated assemblies
    • Standing seam metal over workforce halls and flagship buildings
    • 20 to 30 year manufacturer NDL warranties
    • TIPS and bond procurement experience

    Frequently Asked Questions

    Ready to Plan Your Campus Roofing Project?

    Get a no-pressure assessment from one of Texas and Oklahoma's most experienced educational roofing teams.

    Call (877) 487-4826