Masonic Lodge Grapevine
A 6,000 sq ft PVC overlay on a 108-year-old building in Grapevine's historic district, adding insulation and complete waterproofing without a full tear-off.
About the Client
This Masonic Lodge building has stood in the historic district of Grapevine, Texas for over a century. At 108 years old at the time of the project, the building continues to serve as an active meeting space for the lodge and its members, hosting regular events and gatherings throughout the year.


The Challenge
The existing roof was a built-up system with 1" perlite over a wood deck. After decades of service, the system was failing and provided little to no meaningful insulation value for the building. A full tear-off on a building of this age carries risk, since removing the existing system exposes an aging wood deck to weather and can uncover unexpected structural conditions. The building also needed to remain in service throughout the project, as lodge activities continued during construction.
Our Solution
Rather than a full tear-off, TriVAN recommended an overlay system that would deliver both waterproofing and thermal performance improvements. The approach layered a new roof assembly over the existing built-up system: one layer of ISO insulation to bring the building up to modern energy standards, a coverboard for hail impact resistance and membrane support, and a mechanically fastened 50 mil Duro-Last PVC membrane as the primary weather barrier. To address the parapet wall detail, TriVAN added a wood nailer that allowed the new roof system to extend up and over the wall, creating continuous edge-to-edge, deck-to-sky waterproofing rather than terminating the membrane at the wall base.
For a low-slope building being assessed for a membrane recover, review our PVC roof system selection and installation services. The roof condition and proposed assembly determine whether the approach is suitable for your building.


Project Execution
Work began by preparing the existing built-up roof surface as the substrate for the new assembly. One layer of ISO insulation was installed over the existing system, providing thermal performance the building had lacked. A coverboard was installed over the insulation, adding hail impact resistance and creating a solid surface for the membrane. The Duro-Last 50 mil PVC membrane was mechanically fastened over the coverboard. At the parapet wall, a wood nailer was installed to allow the membrane to carry up and over the wall for complete waterproofing coverage at this critical transition. All work was performed without interrupting lodge activities inside the building.
Results & Outcomes
The lodge now has an energy efficient roof system with continuous edge-to-edge, deck-to-sky waterproofing. The addition of ISO insulation addressed a longstanding gap in the building's thermal envelope, and the coverboard provides hail impact resistance appropriate for the North Texas climate. The project delivered a Duro-Last NDL warranty with consequential damages coverage. The overlay approach avoided the cost, waste, and risk associated with tearing off the original system, and lodge operations continued uninterrupted throughout construction.
Project Highlights
Key Takeaways
Before
Roof condition prior to work




After
Completed roof installation