    Addison Airport - Glenn Curtiss Hangar

    Addison, TX
    Addison Airport / Aviation

    A 19,000 sq ft flute fill overlay on an active jet repair hangar in Addison, TX, converting a failing metal roof into a high-performance PVC system with 2" hail coverage.

    Roof Size
    19,000 sq ft
    System
    Duro-Last 80 mil Duro-Fleece PVC membrane with EPS flute fill overlay, DensDeck cover board, 24-gauge Kynar metal edge details
    Project Type
    Flute Fill Overlay / Metal Roof Recovery
    Completed
    Jan 2026

    About the Client

    The Glenn Curtiss building at Addison Airport serves as an active aviation repair hangar, housing operations that require uninterrupted access and climate control. As a municipal airport facility, the building needed a roofing solution that would provide long-term protection while meeting specific warranty requirements for the North Texas climate.

    Addison Airport - Glenn Curtiss Hangar project
    Addison Airport - Glenn Curtiss Hangar challenge

    The Challenge

    The existing metal roof had reached the end of its useful life, and the old skylights needed to be removed and replaced with solid deck. The client had specific requirements: they needed a roof system that would qualify for 2" high hail impact coverage given the building's location in the Dallas-Fort Worth hail corridor. Perhaps most critically, the hangar operations could not be disrupted during the installation, as jet repair work needed to continue throughout the project.

    Our Solution

    A 2024 roof assessment revealed an opportunity: while the metal roof was failing as a weather barrier, the underlying structure remained sound and could serve as the deck for a recovery system. Rather than a costly tear-off and replacement, TriVAN recommended a flute fill overlay approach that would transform the existing metal roof into a solid substrate for a new PVC membrane assembly. This solution addressed all of the client's requirements. The Duro-Last PVC system with the complete assembly qualifies for 2" high hail impact warranty coverage, protecting both the membrane and the underlying components. The approach also minimized disruption since crews could work from above without affecting hangar operations below.

    For an existing metal roof being evaluated for a PVC overlay, explore our commercial PVC roofing assessment and installation services. The roof condition and proposed assembly determine whether the approach is suitable for your building.

    Addison Airport - Glenn Curtiss Hangar solution
    Addison Airport - Glenn Curtiss Hangar execution

    Project Execution

    The installation began with removing the old skylights and replacing those sections with metal deck to create a continuous roof surface. Crews then mechanically attached 1" EPS insulation flute fill between the ribs of the existing metal roof, creating a level substrate for the membrane system. A layer of ½" primed DensDeck cover board was fully adhered over the flute fill, providing additional protection and a smooth surface for the membrane. The Duro-Last 80 mil Duro-Fleece PVC membrane was then fully adhered to the cover board. All curbs and penetrations were flashed per Duro-Last specifications, and 24-gauge shop-formed sheet metal edge details were installed at the building perimeter in Kynar finish. The existing gutters and downspouts were replaced to complete the water management system.

    Results & Outcomes

    The project was completed during normal business hours with zero interruption to the hangar's jet repair operations. The finished roof system carries a Duro-Last NDL (No Dollar Limit) warranty with 2" hail coverage, providing comprehensive protection for the membrane and complete assembly. The warranty does not require annual maintenance and is not voided by ponding water or cooking grease, reducing long-term ownership burden for the airport facility.

    Project Highlights

    Zero business interruption during installation
    Converted failing metal roof into high-performance PVC system
    NDL warranty with 2" hail coverage for complete assembly
    No annual maintenance required to maintain warranty
    Skylights replaced New gutters and downspouts included with solid metal deck
    Energy efficient with UV reflective membrane

    Key Takeaways

    This project demonstrates how a thorough roof assessment can uncover cost-effective solutions that might not be immediately obvious. What appeared to be a failing metal roof actually provided a solid foundation for a high-performance recovery system. The flute fill overlay approach delivered the hail protection the client required while avoiding the expense and disruption of a complete tear-off. For facilities that cannot afford operational downtime, this type of recovery system offers a practical path to long-term roof performance.

    After

    Completed roof installation

    Addison Airport - Glenn Curtiss Hangar - After 1
    Addison Airport - Glenn Curtiss Hangar - After 2
    Addison Airport - Glenn Curtiss Hangar - After 3