A 40,300 sq ft TPO roof installation across three commercial buildings in Mesquite, TX, completed under challenging weather conditions and a compressed timeline.
About the Client
Taurus Commercial is a general contractor with whom TriVAN has built a strong working relationship over the past decade across numerous projects. This ongoing partnership reflects a shared commitment to quality workmanship and reliable project delivery.


The Challenge
This project faced significant obstacles from the start. Upstream construction delays pushed back the roofing timeline, creating a compressed schedule that put pressure on all parties involved. Weather conditions compounded the difficulty throughout the project duration, with excessive heat, high winds, and heavy rains all impacting the work. The combination of schedule pressure and unpredictable weather required careful coordination and consistent effort to keep the project on track.
Our Solution
TriVAN's approach was straightforward: stay focused on the scope of work and take each challenge one step at a time. Rather than getting caught up in the broader project tensions, our team concentrated on what they could control. Crews worked six days a week for several months straight, maintaining momentum despite the difficult conditions. Clear, consistent communication with the general contractor helped address issues before they escalated and kept everyone aligned on priorities and progress.
For a Mesquite property with similar membrane, parapet, or metal edge needs, review our commercial roofing services in Mesquite. The roof condition and proposed assembly determine whether the approach is suitable for your building.


Project Execution
The installation began with thorough preparation, clearing debris from the metal deck to ensure a clean substrate. Two layers of polyisocyanurate (ISO) insulation were installed in a staggered pattern and mechanically fastened to the metal deck, achieving an R-value of 21 for improved thermal performance. The TPO membrane was then installed over the insulation using 10-foot rolls, with the perimeter picture-framed for a clean, secure edge detail. Parapet walls received fully adhered TPO membrane for reliable waterproofing at these critical transition points. Metal coping caps were installed on most parapet sections, while termination bar was used where appropriate based on wall conditions.
Results & Outcomes
The project was completed by the year-end deadline despite the compressed timeline and weather challenges. The finished roof system carries a full manufacturer warranty and delivers improved energy efficiency through the R-21 insulation assembly. The successful completion reinforced TriVAN's long-standing relationship with Taurus Commercial.