Gainesville Mall Redevelopment
A 100,000 sq ft roof replacement on a repurposed mall in Gainesville, TX, removing a failing ballasted BUR system and installing a new Duro-Last PVC roof tied into existing standing seam metal.
About the Client
This building began its life as a shopping mall and was being repurposed for new commercial use. Repurposed retail buildings like this one often come with aging roof systems that were installed for the original use decades earlier, and a change in ownership or purpose is a natural point to address deferred roofing needs.

The Challenge
The existing roof was a ballasted built-up roof (BUR) system that had developed numerous leaks across the large 100,000 sq ft area. The ballast rock had to be removed before any roofing work could begin, and the old system needed to be taken down to the metal deck. Once exposed, sections of the metal deck were found to be damaged and required replacement. An additional complication was the building's roof configuration: the low-slope roof needed to tie into an existing standing seam metal roof above it, requiring careful detailing at the transition.
Our Solution
TriVAN performed a complete tear-off and replacement, removing the failing BUR ballast system and installing a new Duro-Last PVC roof. The scope required removing the ballast rock, tearing off the old system down to the deck, replacing damaged metal decking, and installing the new single-ply membrane system. The transition between the new low-slope PVC roof and the existing standing seam metal roof above required specific flashing and detailing to maintain watertight integrity at the connection. TriVAN also handled the ballast rock removal in an environmentally responsible way. Rather than sending the rock to a landfill, the material was loaded into dump trucks and delivered to TriVAN's 1.5 acre yard to be repurposed.

Project Execution
Work began with vacuuming the ballast rock off the roof and loading it into dump trucks for transport to TriVAN's yard for reuse. With the ballast removed, crews tore off the old BUR system down to the metal deck. The exposed deck was inspected, and damaged sections were replaced to create a sound substrate for the new roof. The Duro-Last PVC membrane system was then installed across the 100,000 sq ft area. At the point where the low-slope roof meets the existing standing seam metal roof above, crews installed proper flashing and transition details to tie the two systems together and maintain complete waterproofing.
Results & Outcomes
The repurposed mall now has a new Duro-Last PVC roof system that resolved the widespread leaking of the old ballasted BUR roof. The damaged metal deck was repaired as part of the project, and the transition to the existing standing seam metal roof was properly detailed for long-term performance. The building is now well positioned for its next chapter with reliable, watertight roof protection over the full 100,000 sq ft. The ballast rock was diverted from the landfill and repurposed at TriVAN's yard.
Project Highlights
Key Takeaways
Before
Roof condition prior to work









After
Completed roof installation